We had some patio stones in this area with pea gravel around them, for several years and it was better than mud, BUT it really needed to be replaced. This was especially true in the last couple of years when the paving stones starting shifting and tipping because of tree roots. We took many of them out because they were not easy to walk on, but then we had.... mud, when it rained.
This project was a big one and had been put off for a long time, but finally we decided to get on with it and I was glad to get the project started.

The guys dug and cut out tree roots and dug some more.
Next step was to put a layer of limestone down as a base... I don't remember how much they did, but I think it was 3"-4" deep.
Next was the rebar. This step is important to keep the sidewalk and
driveway level with each other and prevent settling. The guys drilled
holes into the existing sidewalks and the driveway and made a grid of
rebar.

Finally, we were all ready and the Cement Pouring Day had arrived!
We had gone over instructions so that everyone knew what to do. We had to do this fast since the truck would only be here for 1 hour for the price they quoted us. Any time over an hour would be $90 more each hour and we didn't want to pay that!
We had our hand tools all ready.

We had all of the long tools ready too. We didn't know what all we would need, so we tried to have everything we could think of for the job.
We had never done a big cement job like this before... and this was in the FRONT of the house too, so it HAD to be successful! Pressure.
Son #2 had done research on line for this project and we talked several times leading up to this project on what to do.

We waited and then the truck pulled up and we all sprang into action, ready to rush.
We couldn't get to work though, since the cement truck driver had to check the cement and get it ready for our job. So, we waited some more.
We did a little more tamping of the stones... that's why the tamper is there.
We had 3 wheelbarrows all ready for this and people assigned to "man" them.
Time to dump cement and rush for the next load. Son #4 on the wheelbarrow here and Son #2 working the cement. Son #3 is at the wheelbarrow being filled and will bring the next load... and I am on the wheelbarrow next in line after him.
Moving along as we added so many wheelbarrow loads of cement. It was hot and we were rushing so fast.
We started to wonder if the 2 yards of cement we had paid for would be enough. We rushed through hoping it would be plenty.
We were doing another project at the same time... stabilizing a brick retaining wall. My husband and Son #4 ended up doing most of this job.
We kept watch on how much cement was still needed out front. Rush rush rush. Our hour was ticking away....
We were getting close to the end of the sidewalk... though we did have to go around the corner yet .... the retaining wall curves, so we made the new sidewalk go around that curve.

Cement was almost gone, but it looked like we would be okay. I talked with the cement truck driver and told him I was sure he could tell we had never done this before and that we didn't really know what we were doing, as I laughed with relief that we were getting done within our hour AND we had enough cement.
He said we were much more prepared than most professional jobs he delivers to. He was REALLY impressed with our work. Wow! :)
Still rushing to pack the cement in and smooth it off before it sets up too much. This step was not as easy as it looks!
Closer to the road side of the project, we were still packing the cement in and filling low spots and getting it level with the driveway and city sidewalk.

We were all taking turns using hand tools and working the cement. I was doing my part here... We were getting to point of wanting and needing a break, but we still needed to hurry.
The picture below shows Son #3 working the corner closest to the house.
Son #2 is doing finishing work here... smoothing the edges and making the cuts.
This son headed up this whole job... and that gave him experience while also helping us. We have done many many home school shop projects like this. Dad pays for the materials (Usually, we have to save up money for the project before we do it, but that is part of life, too.) and the kids(and the whole family!) learn new skills. A win win. :) Son #2 has already graduated a few years ago, but the principle still works!
It looks great! We were surprised how great it was turning out... Like a "real" sidewalk! :)
By the way, our two daughters also worked on this project... not as "hands on" as the rest of us, but their work was so valuable to the project also.
They helped with tools, cold drinks, snacks, and encouragement.
In this picture, you can see the house numbers by the front door... hard to see, but they are there. Those are shown in the post:
Make Your Own House Numbers
Wow, the sidewalk.. and the brick wall sure added a LOT to the look our our house. We have had some visitors who do this kind of work and they were VERY complimentary of the job.
It has been so much nice to use that sidewalk instead of stepping stones or dirt.
The rock wall was a project that Sons #2,3,4 did... they did a great job and the sidewalk made it look finished.
By the way, we bought all of those wall bricks off of Craigslist, which saved us a lot of money on the project. They are not always on there, but if you are needing some, it can be a great place to check for some at about half of the price from the store.
We added a strip of garden around the inside of the top of the brick wall and I added hostas, dianthus and crocus, so these two projects have really added to the curb appeal of our home. We get many comments about our landscaping... but we don't spend a lot of money on it... someday, I will do a post on tips to do that.
I was really thankful for the way this project turned out and I was even more thankful that it was a family project and we all worked so hard on it together. Son #1 doesn't live here anymore and he didn't work on this project, but he still gets involved in others, like this one that he did mostly on his own and we have sure enjoyed using these wonderful bookshelves!
Family Room Project:Adding Built-In Bookshelves
Thank you for visiting today. There are so many projects that can add to the curb appeal of a house.. some are small and easy and others are bigger and more involved. I would love to hear, in the comments, what you have done(or plan to do) to improve your curb appeal. I hope you have a great week.
Improving Curb Appeal-Mailbox
Shared on:
Dishing It or Digging It
Snickerdoodle Create Bake Make
Scraptastic Saturday
Friday Feature Linky
Simple Saturdays
Beautifully Creative Inspired
Saturday Sparks
Friday at the Fire Station
Blogger's Pit Stop
Vintage Charm
Paula's No Rules Weekend Party
Thursday Favorite Things
Wise Woman
Wow Us Wednesday
Talk of the Town
Tuesdays w/ a Twist
Inspire Me Tuesday
Cooking and Crafting w/ J and J
Inspire Me Monday
Modest Mom
Art of Homemaking
Over the Moon Link Up
Featured on:
Scraptastic Saturday